Project Details
The project is located at the Wasfi Al Tal Street intersection with Al-Medina Al-Munawarah Street, it is in a form of two lower tunnels with a length of (520 m), with four-lane width, two lanes for each direction, while the upper tunnel is with a length of (400 m) its width of four lanes two lanes for each direction.
The project includes all the complementary works, such as the lighting, pavements, walls, coordinating the work site , ceramic tiling of the walls, pede strains passages, The project was implemented in record time during the period (85 days) before the deadline for its extradition