JABER COMPLEX INTERSECTION PROJECT

Project Details

The project includes a lower tunnel along Mecca Street, with a length of (300 m) and two lanes . It also contains an overpass with two lanes width.
All excavations, roads and the infrastructure of the site had been executed in addition to sewage lines, storm water drainage, electricity, communications and supplementary works includes fountains, paving stone walls and making an architectural fabric from the building stones,the project was implemented in record time during the period (70 days) before the deadline for its extradition.

Location
Amman, Jordan
Type
Building Construction
Value
1.780.000 Million JOD